日期:
来源:雅诚德英语网
He slipped end-over-end machine foundation construction, according to drawings computing basis, according to the elevation of the top design and specification requirements in fill material.
涵管机基础施工,根据图纸计算基础顶标高,按设计及规范要求材料进行换填。