日期:
来源:雅诚德英语网
The second phase was the assembly, alignment and moorings of the containers to the concrete platforms with a mechanical crane.
第二阶段是组装、校准和用一个机械起重机来将集装箱提升至混凝土平台。
The second phase was the assembly, alignment and moorings of the containers to the concrete platforms with a mechanical crane.
第二阶段是组装、校准和用一个机械起重机来将集装箱提升至混凝土平台。