A combination of public policy decisions and corporate scheming saw to it that countless convenient and efficient urban streetcar and intra-city rail systems were dismantled.
The Prison Service confirmed that this case was being investigated but meanwhile antibacterial gel pumps had been removed as a "precautionary measure".
Remove the transport seat pads when the engine is shifted on the engine base, install the line plate baseboard, and place the screw jacks according to the installation position.
Pedestrian safety around the centre has been improved with the removal of an existing basement car park driveway to Port Road, as well as the introduction of a VIP vehicle drop-off zone.
Infill brickwork was removed from the front of the two arches. Glass shopfronts surrounded by bright green steel frames now sit in the recesses behind.
The Federal Energy Regulatory Commission ordered the dam removed after concluding that the environmental and economic benefits of a free-flowing river outweighed the electricity generated by the dam.