日期:
来源:雅诚德英语网
Additionally, the design needs to detail decommissioning the current asset, which also requires dependency analysis and planning.
此外,此设计需要详细规定当前资产的退役过程,而这还需要进行依赖关系分析和规划。
Additionally, the design needs to detail decommissioning the current asset, which also requires dependency analysis and planning.
此外,此设计需要详细规定当前资产的退役过程,而这还需要进行依赖关系分析和规划。